<ins id="5wker"><ol id="5wker"></ol></ins>
        <strong id="5wker"></strong>
        <strong id="5wker"><u id="5wker"></u></strong>
        <strong id="5wker"><u id="5wker"></u></strong>
        <ins id="5wker"><ol id="5wker"><pre id="5wker"></pre></ol></ins>
        <strong id="5wker"></strong>
        <ins id="5wker"></ins>
          <strong id="5wker"><u id="5wker"><button id="5wker"></button></u></strong>
              <strong id="5wker"></strong>
              <strong id="5wker"><u id="5wker"></u></strong>
                <ins id="5wker"><u id="5wker"></u></ins>
                <strong id="5wker"><u id="5wker"></u></strong>
                <strong id="5wker"></strong>

                  专业的煤气发生炉厂家!郑州科能机械制造有限公司欢迎您!

                  郑州科能机械制造有限公司

                  郑州科能机械制造有限公司联系方式
                  公司新闻

                  现场加工两段式煤气发生炉On-site processing of two - stage gas generator

                      一、本公司长期出售煤气发生炉、两段式煤气发生炉、回转窑等设备,技术先进,价格合理,质量优。联系电话:86-13676907460

                      二、煤气发生炉烘炉温度的控制:

                      1烤箱下部的气体温度是正确的。

                      2当温度快速上升时,将一些大的木块从入口放入火中并关闭入口孔。当温度缓慢上升时,放一些小木块,增加火力并打开孔。

                      3当温度高于200°C且难以升温时,调整火势,或将更多的木材放入孔中,关闭孔,打开自然通风阀,启动煤机加煤,煤气耗尽,然后加入焦炭。加热速率由自然通风阀打入炉内空气的程度控制。

                      4如果难以加热,请按照鼓风机启动程序启动鼓风机,关闭自然通风阀并打开炉空气阀以进行适当的爆破,用机械通风代替自然通风,并增加燃烧空气以提高炉温。将来,通过调节鼓风量和加入的煤量来加热和加热炉子以控制炉子中的火焰。

                      5,在进入孔之前取下操作平台,从火灾探测孔观察煤的燃烧情况,通过拉动钎焊调整炉底进气口,并通过钎焊,使整个炉膛均匀点火上部火炉纠正部分炉并关闭排放阀的上部。

                      6烤箱后,注意滚筒的水位和气体产生。如果温度高,则温度可以从低到高降低到饱和温度。

                      7温度达到600°C炉况正常气体检测合格的供气规定可以发送给用户,无需生产,如低于800°C不能勉强升温,但要完成168小时烤箱。

                      8每小时记录温度和其他参数以绘制实际的烤箱曲线。

                      9如果没有异常(异常情况需要冷炉关闭,应测试CO含量并修复壳)继续培养材料层。

                      10级炉膛和气体质量合格(CO2≤5%CO≥27%O2≤0.4%)可以连接到电网供气;在将电网送到空中之前,提前引入绝缘箱蒸汽,将温度升高到100°C以上。

                  . the company sells gas generator, two-stage gas generator, rotary kiln and other equipment for a long time with advanced technology, reasonable price and excellent quality.Contact number: 86-13676907460

                  Ii. Control of temperature of gas generator and oven:

                  1 the gas temperature in the lower part of the oven is correct.

                  When the temperature is rising rapidly, put some large pieces of wood into the fire from the inlet and close the inlet hole.As the temperature slowly rises, place small pieces of wood, add fire and open the hole.

                  When the temperature is higher than 200°C and it is difficult to heat up, adjust the fire, or put more wood into the hole, close the hole, open the natural ventilation valve, start the coal machine to add coal, the gas is exhausted, and then add coke.The heating rate is controlled by the degree to which the air is fed into the furnace by the natural ventilation valve.

                  If heating is difficult, please start the blower according to the blower startup procedure, close the natural ventilation valve and open the furnace air valve for proper blasting, replace natural ventilation with mechanical ventilation, and increase the combustion air to raise the furnace temperature.In the future, the furnace will be heated and heated by adjusting the air volume and the amount of coal added to control the flame in the furnace.

                  5. Before entering the hole, remove the operating platform, observe the coal combustion from the fire detection hole, adjust the air inlet at the bottom of the furnace by pulling the brazing, and through brazing, make the whole furnace evenly ignite the upper furnace to correct part of the furnace and close the upper part of the discharge valve.

                  After oven 6, note the drum water level and gas production.If the temperature is high, the temperature can be reduced from low to high to the saturation temperature.

                  7. When the temperature reaches 600°C, the normal gas detection and qualified gas supply requirements can be sent to the user, without the need for production. If the temperature is lower than 800°C, the temperature cannot be barely raised, but the oven needs to be completed in 168 hours.

                  Record the temperature and other parameters every hour to draw the actual oven curve.

                  9. If there is no abnormality (the abnormal condition requires the cold furnace to be closed, the CO content should be tested and the shell should be repaired), continue to culture the material layer.

                  Grade 10 furnace and gas quality qualified (CO2≤ 5% CO≥ 27% O2≤ 0.4%) can be connected to the power grid gas supply;Before sending the grid into the air, steam is introduced in the insulated chamber to raise the temperature above 100°C.




                  上一篇:煤气发生炉的常见故障清除方法Common trouble removal method of gas generator 下一篇:没有了
                  ?
                  ?